Deyar DigitalDeyar ×
Platform DeyarIS Capabilities Sovereignty Company Sign in to DeyarIS↗
Deyar Digital · Riyadh, KSA حوكمة ذكية لثقة رقمية مستدامة

Smart governance for sustainable digital trust.

Deyar Digital builds the platform the Kingdom's institutions stand on. DeyarIS turns risk, compliance and audit into one living system: sovereign, intelligent, and aligned to every regulator that matters here.

40+
Integrated modules
6
Regulatory frameworks
100
In-Kingdom residency
3
Lines of defense, unified
Built for the Kingdom's most regulated sectors
Banking & FinanceCapital MarketsEnergy & UtilitiesGovernment HealthcareTelecomInsuranceAviation Banking & FinanceCapital MarketsEnergy & UtilitiesGovernment HealthcareTelecomInsuranceAviation

01 / THE PLATFORM
One foundation.
Many applications.

Deyar Digital is built as a platform, not a product. DeyarIS is the first application on it, with more sovereign tools for the enterprise already taking shape.
DeyarIS DeyarIS
Pre-launch

The sovereign GRC platform for governance, risk, audit & compliance.

Forty-plus modules working as one system: multi-tenant, trilingual, and engineered to satisfy NCA, SAMA and PDPL without a spreadsheet in sight.

RiskControlsAuditBCMPoliciesEvidenceData GovernanceAI Copilot
In build

Deyar Signal

Continuous threat & regulatory intelligence, fused into your control environment.

On the roadmap

Your next application

The platform is open by design. Tell us what your sector needs built next.

02 / INSIDE DEYARIS
Everything governance needs,
nothing it doesn't.

A single source of truth across the three lines of defense, so risk, assurance and the board finally read from the same page.
G.01

Governance & Risk

Enterprise risk registers, controls and KRIs that link straight to the obligations driving them.

C.02

Cybersecurity

NCA ECC, CSCC and beyond. Maturity tracked, gaps remediated, evidence captured automatically.

A.03

Internal Audit

Risk-based plans, working papers and findings with a CAP lifecycle the board can actually follow.

B.04

Business Continuity

BIA, recovery strategies and tested plans, mapped to the processes they actually protect.

D.05

Data Governance

PDPL-aligned ROPA, consent and data-subject rights, with residency you can prove.

AI.06

AI Copilot & Analytics

A grounded assistant that drafts policies, scores risk and answers the regulator's question for you.

03 / SEE IT LIVE
Not slideware.
A real product.

A 5x5 risk matrix, inherent and residual scoring, and executive dashboards, all bilingual and in-Kingdom.
DeyarIS risk heatmap: a five by five inherent risk matrix

Actual screenshot from DeyarIS

03 / Built for the Kingdom

Sovereign by architecture, not by marketing.

Your data stays in the Kingdom, on infrastructure you can audit. DeyarIS is cloud-agnostic and deployable on-premise, so residency, control and assurance stay design decisions, never compromises.

RESIn-Kingdom residency in Jeddah & Riyadh regions, or your own data centre.
ISOEngineered to ISO 27001 controls end-to-end.
ENCMulti-tenant architecture with encryption at rest and in-Kingdom key custody.
ARTrilingual & RTL-native. Arabic is first-class, never translated.
Frameworks we map to
NCAECC · CSCC
SAMACSF · BCM
PDPLData Protection
ISO27001 · 22301
SDAIAAI Ethics

04 / FROM SIGN-IN TO ASSURANCE
Operational in weeks, not quarters.

A guided path from first login to board-ready reporting, with our consultants beside you the whole way.
01

Onboard

Your tenant is provisioned, branded and seeded with the frameworks your sector mandates.

02

Map

Obligations, controls and risks are mapped once, then reused across every assessment.

03

Operate

Teams run assessments, audits and continuity tests inside one workflow engine.

04

Assure

Live dashboards turn the day's work into evidence the board and the regulator trust.

ابنِ حوكمتك على أساس متين

Build governance on solid ground.

See DeyarIS mapped to your regulators in a 30-minute walkthrough, or sign in if you already have the keys.